Switchboard upgrades and safety switches.

Ceramic fuses, no RCDs, and a board that was full twenty years ago. The upgrade that quietly fixes most of the faults in an older installation.

Why old boards get replaced

A lot of Gippsland homes and sheds still run rewireable ceramic fuses. A fuse protects the cable from overload, which is what it was designed to do — but it does nothing to protect a person. An RCD trips on a current imbalance of around 30 mA in tens of milliseconds, which is what stops a shock becoming an electrocution.

If your board has no test buttons on it, it has no RCDs, and nothing in that installation is protecting anyone from contact with a live conductor.

RCBOs rather than a shared RCD

Where there is room, we fit RCBOs — one device per circuit combining overload and earth-leakage protection. The practical difference is that a fault on the outdoor power circuit drops that circuit only, instead of taking out the lights, the fridge and the alarm with it. It also makes fault finding dramatically quicker later on.

Asbestos backing boards

Switchboards installed before the mid-1980s often sit on asbestos sheeting. It is safe while it is undisturbed and dangerous once anyone drills or cuts it. If we find it, we say so and deal with it properly rather than working around it — that is not a corner worth cutting.

Scope

What a board upgrade usually involves

  • Replacing rewireable fuses with circuit breakers or RCBOs
  • Fitting safety switches (RCDs) to power and lighting circuits
  • Main switch and consumer mains replacement where undersized
  • Enclosure replacement where the board is full or deteriorated
  • Asbestos backing board identification and safe removal
  • Correct circuit labelling and an accurate board schedule
  • Surge protection for sensitive equipment
  • Earthing and bonding brought up to current requirements
  • Provision for future circuits — EV charger, solar, air conditioning
  • Certificate of electrical safety on completion
[('No test buttons means no RCDs', 'The quickest check you can do yourself: open the board and look for test buttons. No buttons, no earth-leakage protection, anywhere.'), ('Test yours every three months', 'Press the test button on each RCD. It should trip instantly. If it does not, it is not protecting anyone and needs replacing.')]
How it runs

What working with us actually looks like.

  1. Look at the existing board

    Photos and a proper look at what is there, what is feeding it, and whether the mains are up to the job.

  2. Quote the real scope

    Including the things people get surprised by later — asbestos, undersized mains, or a meter panel that has to be reworked.

  3. Book the outage

    Changeovers mean the power is off for a few hours. We book it when it suits the house or the business, not us.

  4. Change over and certify

    New board in, every circuit tested and labelled, schedule marked up, certificate issued.